I connect a three-phase Victron home battery setup, running cables between the meter cupboard and the shed and wiring the MultiPlus units.
By RobbertPosted
Playing loads the video from YouTube.
18k views on YouTube · Open on YouTube (Robbert DIY projects)
In this miniseries, I show how I install and connect a three-phase Victron home battery setup using three 48V 5kVA MultiPlus units controlled by a Cerbo GX and a custom Lynx distributor. The battery packs are custom-built 16kWh units costing about 1,200 euros each, providing a total of 48kWh of energy storage.
In this episode, I run cables between the main meter cupboard and the shed where the Victron MultiPlus II units are installed. I also add an extra consumer unit in the meter cupboard for more room and a bypass option, and I wire the MultiPlus inverters.
Steps
Step 1: Preparing the meter cupboard
I start by making a small opening in the side of the existing consumer unit to connect a new consumer unit next to it. I want extra room to expand later, including a bypass, and I want my own setup completely clamped off.
Working with the cover closed makes the work safer while I switch off the group. I mount the extra consumer unit against the wall and make a nice doorway between the two units.
What I used
Item Amount Notes consumer unit 1 extra unit for expansion Step 2: Running cables between the meter cupboard and the shed
I pull two five-core 6 mm2 power cables through trunking from the meter cupboard to the shed where the energy storage stands. From the shed, I run another five-core 6 mm2 cable back to the meter cupboard to feed the groups.
I need to protect these cables, so I mount an extra box against the wall in the meter cupboard. The narrower printer caps do not fit the cables, so I use my 3D printer to print a custom risk cube to neatly cover them.
What I used
Item Amount Notes YMvK cable 5x6 mm2 2 5 meters each, running between meter cupboard and shed Step 3: Wiring the meter cupboard
I mark the cables to track which one goes to the shed and which comes from it, then strip a section of the outer sheath to move the wires easily. I set the DIN rail back into the new consumer unit and place a 4-pole earth leakage circuit breaker.
Later, I will install three double-pole earth leakage breakers in the shed, but I add an extra earth leakage breaker in the house for extra safety. I connect the incoming phase wires in color order, connect the earth wires to the earth rail, and finally connect the set to the main house distribution board.
Warning
Twisting cables between neutral and phase creates a 440V reading and can cause a 400V short circuit that destroys equipment, so check your connections twice.
What I used
Item Amount Notes earth leakage circuit breaker 1 4-pole DIN rail 1 reinstalled in consumer unit Step 4: Wiring the shed and the MultiPlus units
In the shed, I strip the incoming cable from the meter cupboard and route the wires to a main switch rated for 40 amp, which lets me disconnect the system from the grid while working on it. I also use warning stickers to keep track of what everything is.
For the MultiPlus inverters themselves, Victron advises against using massive copper wires, so I use flexible 6 mm2 cables. I connect the neutral from the main switch to the AC input on the left pole of the first unit and loop it to the others, then connect the phase wires to individual phases so each unit gets its own phase.
Tip
AC1 always has voltage regardless of grid presence, so feed the AC input carefully and place a 25A backfeed circuit breaker on the returning cable from the shed to the meter cupboard.
What I used
Item Amount Notes flexible cable 6 mm2 3 phase cables main switch 1 rated for 40A overload circuit breaker 1 25A for outgoing power Step 5: Finishing and enclosing the shed installation
I place a terminal block for the peripheral earth connections so all ground wires come together neatly. Officially, all cables should be double-insulated with PVC pipe between the MultiPlus and the cable groove, but since I have plenty of space and will add pipe later, I leave it for now.
To finish the enclosure, I use my 3D printer to make a housing in the same blue color as the Victron units. I place it over the earth leakage and breaker switches to protect them and give the setup a clean aesthetic look.
What I used
Item Amount Notes terminal block 1 for peripheral earth connections 3D printed housing 1 blue color matching Victron units Step 6: Takeaways
Always double-check your phase and neutral wiring to prevent 400V short circuits.
Use flexible 6 mm2 cables for the MultiPlus units as advised by Victron.
Add a main switch in the shed to easily disconnect the system from the grid.
Place backfeed circuit breakers on returning cables to regulate incoming and outgoing power safely.
Everything I used
| Item | Amount | Notes |
|---|---|---|
| consumer unit | 1 | extra unit for expansion |
| YMvK cable 5x6 mm2 | 2 | 5 meters each, running between meter cupboard and shed |
| earth leakage circuit breaker | 1 | 4-pole |
| DIN rail | 1 | reinstalled in consumer unit |
| flexible cable 6 mm2 | 3 | phase cables |
| main switch | 1 | rated for 40A |
| overload circuit breaker | 1 | 25A for outgoing power |
| terminal block | 1 | for peripheral earth connections |
| 3D printed housing | 1 | blue color matching Victron units |
System wiring complete
All cables are neatly installed, the MultiPlus inverters and consumer units are wired, and the enclosure covers the switches nicely. The cabling is securely routed and separated by phase.
If you have questions, comments, or suggestions, drop them in the comments and I will reply or address them in a follow-up video.
Questions from YouTube viewers
Asked in the comments under the video, answered by Robbert.
How do the inverter units handle power outages and disconnect from the grid?
The multiplus units do this themselves. When there is no grid voltage present, the ac input is disconnected.
Will you install a bypass switch in the fuse box to run the house directly from the grid if needed?
Yes, I will show that in the video. The extra box was not strictly necessary, but placing a second box gives me space to add extra things, including the bypass for sure.
What sizes of wire channels did you use initially and upgrade to?
I started with 60x40, which quickly became too small, so I scaled up to 60x80 so everything fits properly now.
What size wire should be used between the busbars?
I have no idea what exact busbars you have, so it might be best to mount a copper sheet bar between them. The Victron Lynx uses a dimension of 30x8mm (240mm2), which is more than enough for 500A.
Do the three units work together to maintain a balanced three-phase grid when going off-grid?
Yes, absolutely.
More from Home battery
- BuildConnecting the Selbro Victron Home Battery Setup with Emergency PowerI connect the Selbro Victron home battery setup permanently inside the meter box with an emergency power function. I test the system by cutting the main power to verify that the house stays fully powered by the batteries.Read the post
- BuildTurn an Action Floor Lamp into a Victron State of Charge IndicatorI turned a cheap Action floor lamp into a live Victron State of Charge indicator using a Wemos D1 mini microprocessor. The lamp connects to the VRM portal over Wi-Fi to display battery capacity with a red minimum zone, a main color bar, charging animations, and a manual dimmer knob.Read the post
- Lessons learnedMy DIY Journey from Childhood Electronics to Victron Power and Custom Projects2022I answer viewer questions about my background, discuss my self-taught electronics journey, review past DIY projects ranging from arcade machines and custom cars to a home Droomvlucht ride and a PC game, and address viewer feedback on my Victron battery setup.Read the post