Build · Swimming pool heating
Measuring and Digging the Subtropical Swimming Pool
I measured and excavated the hole for my DIY subtropical swimming pool garden, renting machinery and installing retaining sheets over two days.
By RobbertPosted
Playing loads the video from YouTube.
938 views on YouTube · Open on YouTube (Robbert DIY projects)
In this second part of my subtropical garden renovation, I focus on laying out and digging the hole for the swimming pool. After shoring up the fence in the first part, I now mark the exact dimensions needed for the 3-meter pool, the perimeter insulation, and the surrounding concrete structure.
To save time and hard labor, I rent excavation machinery and work alongside help to dig out the pit. Over two days of heavy work, we install retaining sheets, clear out 11 trailers of sand, and successfully shape the 14-cubic-meter hole ready for the next phase.
Steps
Step 1: Measuring and marking the pool and veranda layout
I start by measuring the ground to determine where the hole must be dug and where the flat foundation will lie. I also mark where the veranda will stand using square rubber tiles that measure exactly 3 by 3 meters. The pool hole must be at least 340 by 340 centimeters to fit a 3-meter pool in the middle, leaving 20 centimeters on each side for perimeter insulation and the outer concrete basin. I use red spray paint to mark the excavation boundaries.
The hole overlaps with the veranda area. Later in the project, the slanted poles of the veranda can be moved half a meter backward so the motorized rolling pool cover can retract under the veranda without hitting the poles. Beams marked with red dots indicate where the fence poles are in the ground. Between these red dots, I need to dig straight down. Outside of these lines, I do not need to dig, so I can let it slope slightly.
Because the pool is round, we do not need to dig out the corners. These support beams stay on solid ground and continue to support the fence weight even though everything underneath is excavated.
What I used
Item Amount Notes red spray paint 1 used to mark excavation lines square rubber tiles several used to measure the 3 by 3 meter veranda area Step 2: Renting machinery and clearing stones
With the help of two people, we clear the space completely from small stones so it is ready for digging. Digging this by hand would be too much hard work, so we rent small machines from Jansen in Beik. The machines work great and make the work go extremely fast.
What I used
Item Amount Notes excavation machinery 1 rented from Jansen in Beik Step 3: Installing betonplex sheets and digging on the second day
We show a large pit and another pole set in the ground. Next to this pole, we screw betonplex sheets against it to hold back the sand and prevent it from shifting. Today is the second day of digging, and both betonplex sheets are installed on this side while the back is filled with yellow sand.
Today we dig the corners a bit deeper so they also reach a depth of 1.20 meters. This allows the remaining sheet to be put in place so the ground stays firm. Afterward, we excavate the rest of the pool area behind me.
What I used
Item Amount Notes betonplex sheets multiple screwed against poles to hold back sand yellow sand several loads used to fill the back Step 4: Hauling away sand and finishing the excavation
We have now hauled away six trailer loads of sand and need about four more. After two days of intensely hard work, we have removed 11 trailer loads of sand in total, which equals about 14 cubic meters of sand. It was heavy labor, but the hole is finally dug.
What I used
Item Amount Notes trailers 11 used to haul away sand Step 5: Takeaways
Leave 20 centimeters on each side of the pool for perimeter insulation and the outer concrete shell.
Leave the corner poles on solid ground so they can support the fence weight while digging underneath.
Renting machinery from Jansen in Beik saves a tremendous amount of manual labor.
Use betonplex sheets to prevent sand from shifting and sliding into the excavation.
We removed 11 trailer loads of sand totaling about 14 cubic meters.
Everything I used
| Item | Amount | Notes |
|---|---|---|
| red spray paint | 1 | used to mark excavation lines |
| square rubber tiles | several | used to measure the 3 by 3 meter veranda area |
| excavation machinery | 1 | rented from Jansen in Beik |
| betonplex sheets | multiple | screwed against poles to hold back sand |
| yellow sand | several loads | used to fill the back |
| trailers | 11 | used to haul away sand |
Next Steps
The excavation is complete and the pit is ready. In the next episode, we will build the formwork and pour the foundation so it can cure.
More from Swimming pool heating
- PlanningPreparing and Shoring for a Subtropical Swimming Pool6 September 2023I started a major garden renovation project to build a subtropical swimming paradise with an in-ground insulated pool. In this first step, I drilled six deep support poles and shored up the fence to prepare for digging.Read the post
- BuildBuilding the Foundation and Steel Frame for an Inground Pool12 October 2023I pour the concrete foundation plate and install the steel frame and bottom rails for the inground Bestway Hydrium 300cm pool.Read the post
- BuildRocket Stove Pool Heater Build and Testing5 August 2023I build and test a rocket stove pool heater using a stainless steel frame and external spiral pipes filled with sand. The setup successfully warms the pool water by about 5 to 6 degrees at filter pump speed.Read the post