Build · Swimming pool heating

Building the Foundation and Steel Frame for an Inground Pool

I pour the concrete foundation plate and install the steel frame and bottom rails for the inground Bestway Hydrium 300cm pool.

By RobbertPosted

Mini subtropisch zwemparadijs deel 3 (Fundering en frame) zelfbouw ingegraven zwembad(intex bestway)

Playing loads the video from YouTube.

1.8k views on YouTube · Open on YouTube (Robbert DIY projects)

Welcome to part three of building my mini subtropical swimming paradise. In this part, I show how the foundation for the pool is poured and how the steel wall and frame are installed using a Bestway Hydrium 300cm steel wall pool as a formwork.

Work is kept dry and comfortable under a tent and sail. After pouring almost two tons of concrete and letting it cure, I assemble the steel pool frame inside the pit and seal the edges to prepare for pouring liquid concrete insulation later.

Steps

  1. Step 1: Reviewing the plan and preparing the workspace

    Welcome to part three of building my subtropical swimming paradise. In previous parts, I dug a hole that is 3.40 meters across and 1.20 meters deep. I share the master plan through an animation showing the pool, artificial plants, bamboo, wooden verandas, solar heaters on the roof, a tiki bar, and a possible large water slide.

    To stay dry and warm while working, I have stretched a sail over the garden and set up a tent.

  2. Step 2: Preparing the foundation site with wood and stakes

    Almost two tons of concrete bags have arrived for the foundation plate. I laid thick 6cm wooden planks over the edges of the pool so there is no point load on the ground that could cause the hole to collapse, and my pool ladder is already coming in handy. I placed stakes around the 3.40-meter wide hole and set them all exactly 10cm high so the poured concrete will be completely level.

    What I used

    ItemAmountNotes
    concrete bagsalmost two tonsfor the foundation plate
    wooden planksthick6cm thick, placed over the edges to prevent point load
    stakesmultipleset at exactly 10cm height for level pouring
    pool ladder1already coming in handy
  3. Step 3: Placing reinforcement and pouring the concrete foundation

    On a new day, I placed the liner in the pool and put reinforcement all around the bath so the sides and steel crate will bond well with the foundation plate. With the mold ready, I mixed and poured the concrete. After 24 hours, the concrete is hard enough to walk on, and I used a brick to smooth down a high spot and make it flat.

    Concrete takes 24 hours to let you walk on it, and 7 days to reach full strength, but we are not waiting that long to continue.

    What I used

    ItemAmountNotes
    liner1placed in the pool
    reinforcementaround the bathfor good adhesion
    brick1used to smooth high spots on the concrete
  4. Step 4: Assembling the pool frame and steel wall

    I measured the center of the hardened concrete and started laying out the blue bottom rails and brackets to build the frame. I am using a Bestway Hydrium 300cm steel wall pool. Working in the 1.20-meter deep pit presented a danger because climbing down between the wall and the earth to tighten the outer screws is extremely dangerous.

    My solution was to place the blue rail and brackets on stones, set the steel wall inside, screw the side poles on, and reach with my hand under the frame to tighten the screws from the outside.

    What I used

    ItemAmountNotes
    Bestway Hydrium steel wall pool1300cm steel wall pool used as a formwork
    blue bottom rails and bracketsmultiplelaid out to build the frame
    stonesmultipleto support rails during assembly
  5. Step 5: Sealing gaps around the pool frame

    After screwing all the metal support pillars to the back, I sealed the gap under the edge between the concrete and the profiles at the bottom and top with sealant. I do this because we will use the pool as a formwork, placing insulation against the pool and pouring Styrocrete (fluid concrete) outside it. Sealing the openings prevents the liquid concrete from leaking inside and crawling under the liner.

    What I used

    ItemAmountNotes
    sealantmultipleused to seal gaps under the edge and profiles
    insulationmultipleto be placed against the pool
    Styrocretefluid concreteto be poured outside the insulation
  6. Step 6: Planning underground pipes and pump shed

    With the frame installed, I removed the rubber tiles where the pump and filter shed will go 40cm into the ground. Before pouring Styrocrete, underground PVC pipes must be placed and connected to the pool so the pipe openings remain clear. Water pipes and cables will run through these protective pipes to prevent temperature loss in the ground and make it easy to pull new cables or replace leaking pipes later.

    What I used

    ItemAmountNotes
    rubber tilesmultipleremoved for the pump shed location
    PVC pipesmultiplerun underground to protect water pipes and cables
  7. Step 7: Call to action and upcoming episodes

    If you think this is a fun project, please leave a like and click the subscribe button so you do not miss any episodes. Eventually, I will also make a compilation episode where you can watch everything all at once, so stay tuned for that.

  8. Step 8: Takeaways

    • Placing wooden planks over the pool edges prevents point loading and hole collapse.

    • Stakes set at 10cm height ensure the concrete foundation is completely level.

    • Concrete takes 24 hours to walk on and 7 days to reach full strength.

    • Assembling the steel wall on stones in the pit allows safe tightening of outer screws.

    • Sealing gaps around the frame prevents fluid Styrocrete from leaking under the pool liner.

    • Running underground PVC pipes protects lines from frost and allows future cable replacements.

Everything I used

ItemAmountNotes
concrete bagsalmost two tonsfor the foundation plate
wooden planksthick6cm thick, placed over the edges to prevent point load
stakesmultipleset at exactly 10cm height for level pouring
pool ladder1already coming in handy
liner1placed in the pool
reinforcementaround the bathfor good adhesion
brick1used to smooth high spots on the concrete
Bestway Hydrium steel wall pool1300cm steel wall pool used as a formwork
blue bottom rails and bracketsmultiplelaid out to build the frame
stonesmultipleto support rails during assembly
sealantmultipleused to seal gaps under the edge and profiles
insulationmultipleto be placed against the pool
Styrocretefluid concreteto be poured outside the insulation
rubber tilesmultipleremoved for the pump shed location
PVC pipesmultiplerun underground to protect water pipes and cables

Next steps

In the following episodes, we will start on the underground pipes for water lines and power to protect them against frost and prevent temperature loss. A compilation episode will also be made later to view everything at once.